Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*OK TO CONNECT GAS CALL SW GAS 889-1888 |
|
| 11/07/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE RIDGID PIPE NIPPLE THRU WATER HEATER APPLIANCE HOUSING 2) PROVIDE FITTINGS TO MAKE CHANGES OF DIRECTION 3) VENT FROM WATER HEATER TO BE MINIMUM 5' FROM DRAFT HOOD TO TERMINATION AT CAP 4) PROVIDE BONDING OF BLDG GAS PIPING 5) PROVIDE 1" CLEARANCE FROM COMBUSTIBLES FOR WATER HEATER VENT 6) PROVIDE FLUE VENT FOR WALL HEATER USING APPROVED VENT MATERIAL, ROOF FLASHING AND CAP |
|
| 10/11/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*NO UNIONS SHALL BE USED IN LINE PIPING WHERE UNIONS ARE NECESSARY LEFT RIGHT NIPPLES & COUPLINGS SHALL BE USED. PROVIDE ROOF FLASHINGS WHERE PIPING VALVES AT ALL APPLIANCES WITH APPROVED FLEXES WATER HEATER TO HAVE TEMPERATURE PRESSURE RELIEF DEVICE WITH DRAIN TERMINATING 6" -24" FROM FINISH GRADE. WATER HEATER TO HAVE DRAFT HOOD AND CORRECT VENT MATERIAL WITH APPROVED CAP AT TERMINATION. PROVIDE 1" MINIMUM CLEARANCE FROM COMBUSTIBLE FOR WATER HEATER VENT PIPING PROVIDE BONDING OF BUILDING GAS PIPING PROVIDE SOLID BASE FOR WATER HEATER FLUE VENT PIPING SHALL TERMINATION MINIMUM 1' ABOVE TOP OF ROOF WITH APPROVED VENT MATERIAL AND APPROVED VENT CAP. PROVIDE WEATHER PROOF ENCLOSURE FOR WATER HEATER |