Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 12 PSI TEST FROM METER TO WATER HEATER FURNACE & STOVE OK GAS CARD AT METER | |
| 10/24/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*WHERE UNIONS ARE NECESSARY LEFT & RIGHT NIPPLES AND COUPLINGS SHALL BE USED SUPPORT ROOF TOP PIPING AT 8' INTERVALS AND CLAMP IT DOWN. SUPPORT & SECURE GAS PIPING AT WATER HEATER ISNTALL DOUBLE WALL VENT IN CORRECT DIRECTION MINIMUM 5' AND 1' THRU TOP OF ROOF WITH FLASHING AND APPROVED VENT CAP. PROVIDE 3 GALV SCREWS AT EACH JOINT OF VENT PIPING. SECURE GAS PIPING IN FURNACE CLOSET. PROVIDE APPROVED COUPLINGS WHERE REQUIRED. |