Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*GAS PRESSURE TEST IS OK ALL CORRECTIONS HAVE BEEN MADE. |
|
| 10/31/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*GAS PIPING REQUIRES ROOF FLASHING AT POINT OF PENETRATION THRU ROOF PROVIDE MECHANICAL INSPECTION FOR NEW ROOF TOP UNIT. TO OBTAIN GAS CLEARANCE CARD ROOF TOP PIPING TO BE SUPPORTED & SECURE AT CORRECT INTERVALS NOTE SUPPORTS FOR UNIT TO BE PERPENDICULAR TO ROOF JOISTS IF YOU GAS LINE IS THE ONE WITH THE UNION IT SHALL BE REPLACED WITH LEFT-RIGHT NIPPLE & COUPLING |
|
| 10/27/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*THE TEST GAGE THAT IS ON THE GAS RISER THAT HAS B ON THE 90 DEGREE IS AT 0 LBS, 10 LBS IS REQUIRED. IF GAS PACK ON ROOF IS LOCATED @ THE HIGHEST PART OF UNIT THEN PLEASE PROVIDE ACCESS TO THIS APPLIANCE |
|
| 10/04/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*GAS PRESSURE TEST WAS @ 1 LB , 10 LB REQUIRED. SHALL PROVIDE ACCESS TO THE ROOF@ TIME OF INSPECTION |