Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/27/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 10 PSI TEST SHALL HOLD FOR 15 MINUTES WITH NO PRESSURE DROP 2) WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES AND COUPLINGS SHALL BE USED 3) REDUCING BUSHINGS SHALL ONLY BE USED IN ACCESSIBLE LOCATIONS 4) PROVIDE BONDING OF BLDG GAS PIPING 5) YOUR GAS PIPING IS UNDERSIZED |