Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2005 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 09/30/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 09/26/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* WHERE UNIONS ARE NECESSARY LEFT RIGHT NIPPLES & COUPLINGS SHALL BE USED. 1. ALL UNDERGROUND PIPING TO BE SCOTCH COATED PIPE. INCLUDING RISER AT METER. 2. PROVIDE APPROVED COUPLINGS AT JOINT A THREAD PROTECTOR IS NOT. 3. PROVIDE PIPE PRIMER THEN TAPE ALL TOOL MARKS AND UNDERGROUND FITTING. PIPE PRIMER IS A TYPE OF GLUE. 4. YOUR GAS PIPING CANNOT BE BURIED UNDERGROUND UNDER YOUR BACK PORCH. 5. WATER HEATER TEMPERATURE & PRESSURE RELIEF REQUIRE FULL SIZE DRAIN PIPE TERMINATING 6" 24" FROM FINISH GRADE. 6. WATER HEATER REQUIRES WEATHER PROOF ENCLOSURE. 7. WATER HEATER REQUIRES MINIMUN OF 5' OF APPROVED VENTING MATERIAL, SHALL BE DOUBLE WALL OUTSIDE OF WEATHER PROOF ENCLOSURE TERMINATING 2' ABOVE TOP OF BUILDING WALL WITH APPROVED DOUBLE WALL VENT CAP. 8. PROVIDE BONDING OF BUILDING GAS PIPING. |