Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2005 | PLUMBING - FINAL | Denied | SEE NOTE #2 FROM 9/20/05 NOT READY | |
| 10/04/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*SEE NOTE #2 FROM 9.20/05 INSPECTION AND PROVIDE 3 GALV SCREWS AT EACH JOINT OF WATER HEATER VENT PIPING |
|
| 09/27/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WATER HEATER SEE NOTE #2 FROM 9/20/05 INSPECTION. NO FLEX SHALL BE USED |
|
| 09/20/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BONDING OF BUILDING GAS PIPING 2) WATER HAETER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO BE FULL SIZE GRAVITY DRAIN TO DAYLIGHT. WITH APPROVED PIPING MATERIALS |