Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*16 PSI AIR TEST FROM METER OVERHEAD TO WATER HEATER & FURNACE ONLY OK. GAS CARD AT METER. | |
| 10/04/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*SEE NOTE FROM 9/20/05 TEST SHALL HOLD FOR 15 MIN WITH NO PRESSURE DROP |
|
| 09/27/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TO BE FULL SIZE GRAVITY DRAIN TO DAYLIGHT WITH APPROVED PIPING MATERIALS 2) TEST AT 8.5 ON ARRIVAL TEST AT 8.3 15 MINUTES LATER. PLEASE PROVIDE MINIMUM 10 PSI AT NEXT INSPECTION |
|
| 09/20/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 10 PSI TEST SHALL HOLD FOR 15 MINUTES WITH NO PRESSURE LOSS |