Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/30/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTE FROM 9/26/05 GAUGE TO BE IN WORKING ORDER |
|
| 09/26/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* THIS IS NOT A RECONNECT. 1. PROVIDE WORKING GAS TEST GAUGE. MINIMUM 10 PSI TEST SHALL HOLD PRESSURE FOR 15 MINUTES WITH NO PRESSURE DROP. 2. PROVIDE PERMIT FOR ROOF TOP HEATING & A/C UNIT. 3. PROVIDE BONDING OF BUILDING GAS PIPING. 4. SUPPORT ROOF TOP GAS PIPING AT 1ST 90 DEGREE CHANGE OF DIRECTION ON ROOF. |
|
| 09/23/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 9:30 PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM AT TIME OF REINSPECTION. |