Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*PROVIDE 100 SQ INCHES MINIMUN UPPER & LOWER COMBUSTION AIR FOR WATER HEATER | |
| 09/30/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*8:04 NO ACCESS PLEASE READ ALL NOTES AND COMPLY THEN CALL FOR INSPECTION. |
|
| 09/28/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 10 PSI TEST SHALL HOLD FOR 15 MIN WITH NO PRESSURE LOSS. VENT FROM WATER HEATER TO BE DOUBLE WALL FROM EXIT OF WEATHER PROOF ENCLOSURE WITH APPROVED VENT CAP. PROVIDE WEATHER PROOF ENCLOSURE FOR WATER HEATER. PROVIDE BONDING OF BUILDING GAS PIPING. GAS SYSTEM TO BE TESTED IN ITS ENTIRETY. VENT FROM FURNACE TO BE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. |
|
| 09/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 8:30 AM NO ACCESS NOT A COMPLETE LIST 2) 10 PSI TEST SHALL BE ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES. PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM AT TIME OF REINSPECTION |