Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) 21 PSI AIR TEST FROM METER NEW PIPING OVERHEAD TO DRYER ONLY OK CONTRACTOR TO MAKE FINAL CONNECTION AND VERIFY NO GAS LEAKAGE |
|
| 09/14/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REQUIRED MINIMUM 10# TEST 2) SOAP FITTINGS TO LOCATE LEAK-RETEST |