Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/21/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 10 PSI MINIMUM TEST SHALL HOLD WITH NO PRESSURE DROP FOR 15 MINUTES |
|
| 09/16/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 3 SCREWS REQUIRED AT EACH JOINT OF FURNACE AND WATER HEATER FLU 2) 1" CLEARANCE TO COMBUSTIBLES REQUIRED AROUND FLU 3) DRIP-LEG REQUIRED AT GAS CONNECTION TO FURNACE 4) PROVIDE PERMIT AT JOB SITE CLAYTON TREVILLYAN 909-5102 |
|
| 09/14/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) NOBODY HOME 2) PLEASE LEAVE A NAME AND CONTACT NUMBER WHEN SCHEDULING THIS INSPECTION |
|
| 09/09/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE ACCESS TO ENTIRE GAS SYSTEM AT T6IME OF INSPECTION |