Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/12/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE TEMPERATURE AND PRESSURE RELIEF DRAIN PIPE FULL SIZE TERMINATION 6"-24" FROM FINISH GRADE 2) PROVIDE BONDING OF BLDG GAS PIPING 3) VENT FROM WATER HEATER TO BE DBL WALL AT EXIT OF WEATHER PROOF ENCLOSURE AND HAVE MINIMUM 1" CLEARANCE FROM WOOD (COMBUSTIBLE MATERIAL) AT ROOF |