Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*GAS CARD AT METER | |
| 11/22/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*1:55 LEAVE A CONTACT PHONE # OR HAVE AN ADULT PRESENT TO PROVIDE ACCESS AT NEXT REINSPECTION |
|
| 11/18/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*1:55 PLEASE HAVE SOME ONE PRESENT TO PROVIDE ACCESS FOR REINSPECTION. |
|
| 09/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE NOTES #6, 7, 9. AND PROVIDE BONDING OF BUILDING GAS PIPING. |
|
| 09/07/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 10 PSI MINIMUM SHALL BE TEST PRESSURE WITH NO PRESSURE DROP FOR 15 MINUTES 2) PRIME AND TAPE ALL TOOL MARKS ON UNDERGROUND PIPING 3) USE NEW PIPING AT RISER TO BLDG CONNECTION AT SERVICE ENTRANCE 4) WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES AND COUPLINGS SHALL BE USED 5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO BE RIDGID FULL SIZE GRAVITY DRAIN TO DAYLIGHT 6) ALL JOINTS FOR VENT PIPING FROM WATER HEATER AND FURNACE TO HAVE 3-GALV SCREWS AND BE MADE UP CORRECTLY 7) FURNACE TO HAVE RIDGID NIPPLE THRU APPLIANCE HOUSING 8) PIPING FOR FURNACE TO BE ARRANGED TO PROVIDE FULL SPACE FOR WATER HEATER 9) PROVIDE CORRECT TRANSITION FROM FURNACE TO VENT PIPING 10) HAVE SOMEONE PRESENT TO PROVIDE ACCESS AT NEXT INSPECTION |