Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) 13 PSI AIR TEST FROM NEW METER LOCATION ABOVE GROUND TO EXISTING SERVICE ENTRANCE TO STOVE, WATER HEATER AND FURNACE OK 2) CORRECTION MADE |
|
| 09/07/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SINGLE WALL VENT PIPING REQUIRES 6" MINIMUM CLEARANCE FROM COMBUSTIBLES FOR FURNACE 2) REMOVE TAPE AT DRAFT SPACE AT SINGLE TO DBL WALL VENT CONNECTION 3) PROVIDE APPROVED VENT CAP FOR FURNACE WATER HEATER TERMINATING 2' FROM FURNACE 3' FOR WATER HEATER ABOVE AIR INTAKE FOR COMBUSTION AIR 4) PROVIDE GOOD CONNECTION FOR BONDING CLAMPS (REMOVE PAINT) OR CLEAN PIPING |