Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 09/23/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* 1. 10 PSI TEST SHALL BE ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE DROP FOR 15 MINUTES. 2. VENTS FROM WATER HEATER & FURNACE TO BE MADE UP CORRECTLY AND HAVE 3 GALV SCREWS AT EACH JOINT. 3. VENT FROM FURNACE TO BE 2' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE.WITH APPROVED DOUBLE WALL VENT PIPE. 4) WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO GRAVITY DRAIN TO DAYLIGHT. |