Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTION MADE 2) GAS CARD AT METER |
|
| 09/02/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) YOUR TEST GAUGE IS DEFECTIVE, ENTIRE SYSTEM SHALL HOLD MINIMUM 10 PSI FOR 15 MINUTES WITH NO PRESSURE DROP 2) MINIMUM BURIAL DEPTH FOR PLASTIC GAS PIPING IS 18" |