Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/08/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE DBL WALL VENT PIPE THRU ROOF TO POINT OF TERMINATION WITH APPROVED CAP AND 3-GALV SCREWS AT EACH JOINT |
|
| 08/29/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REINSTALL ELECTRICAL BONDING CLAMP TO COLD H20 PIPING 2) SECURE ? PIPING THAT FEEDS WATER HEATER 3) VENT FROM WATER HEATER TO TERMINATE MINIMUM 2' ABOVE ROOF |