Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*INSPECTION RESULT FROM STATE BOILER INSPECTOR. GAS CARD LEFT AT METER | |
| 10/05/2005 | PLUMBING - FINAL | Not ready for Inspection | PROVIDE CORRECT FLUE VENT FOR DEVICE STATE BOILER INSPECTION PROVIDE PROPER COMBUSTION AIR FOR APPLIANCES. IVRS - Inspection :* |
|
| 08/30/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) GAS PIPING TO BE PIPED TO COMPLETION 2) PROVIDE MANUFACTURERS INFORMATION ON FLUE VENT TERMINATION 3) PROVIDE 3 GAUGE COPPER GROUND WIRE FOR MANUFACTURERS RECOMENDATION 4) PROVIDE 2" SIZING AT ? FOR FUTURE GROWTH PER PLAN 5) NO TOE CONNECTION ALLOWED AT TEST AREA EXCEPT FOR DURATION OF TEST 6) THIS DEVICE IS INTENDED FOR INDOOR USE PROVIDE LISTING FOR USE OUT DOORS 7) PLEASE PROVIDE INSPECTION BY STATE BOILER INSPECTOR PRIOR TO FINAL. PLEASE PROVIDE ACCESS TO TEMPERATURE AND PRESSURE RELIEF INFORMATION AND PIPING |