Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE |
|
| 08/22/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 03050 - 20 PSI TEST FROM METER OVERHEATED TO STOVE AND WATER HEATER ONLY. APPROVED 2) 03090 - PROVIDE BONDING OF BUILDING GAS PIPING 3) PROVIDE 3-? SCREWS AT EVERY JOINT 4) SOME GAS PIPING PENETRATION INTO BUILDING 5) VENT FROM WATER HEATER TO BE 3' ABOVE TOP OF ? WHEN WITHIN 10' OF ? ? WITH APPROVED VENT ? AND CAP. |