Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 08/17/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) 22 PSI TEST FROM METER EXISTING PIPING UNDERGROUND UP AT GARAGE THRU GARAGE BACK UNDERGROUND NEW SCOTCH COAT UP AT BLDG THRU SERVICE VALVE TO ATTIC CSST TO STOVE, WATER HEATER, FURNACE AND FIRE PLACE 2) SHALL PROVIDE APPROVED GAS SHUT OFF VALVE OUTSIDE OF FIRE PLACE HEARTH WITHIN 4' OF HEARTH 3) CHIMNEY DAMPER TO BE MADE UN CLOSEABLE 4) PIPING IN FURNACE AND WATER HEATER CLOSET TO BE SUPPORTED AND SECURED 5) PIPING IN ATTIC SPACE TO BE SUPPORTED AND SECURED PER CSST RECOMENDATIONS 6) ALL VENT PIPING FROM WATER HEATER AND FURNACE TO BE SECURED WITH 3-GALV SCREWS PER JOINT 7) PROVIDE BONDING OF BLDG GAS PIPING 8) PROVIDE CITY APPROVED GAS ISOMETRIC PLAN OF YOUR SYSTEM IT APPEARS TO BE UNDER SIZED 9) PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVE FOR STOVE |