Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT VENT CAP MINIMUM 2' ABOVE HIGHEST PART OF ROOF FOR FURNACE 2) WATER HEATER VENT TO BE DBL WALL TO POINT OF TERMINATION WITH APPROVED VENT CAP 3) WATER HEATER TEMPERATURE PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH APPROVED INSTALLATION |