Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/17/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM 100 SQ INCH COMBUSTION AIR OPENINGS FOR BOTH UPPER AND LOWER COMBUSTION AIR TO FURNACE 2) VALVE SHALL BE BEFORE FLEX AT CONNECTION TO FURNACE 3) VENT FROM FURNACE TO BE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE 4) SECURE GAS PIPING IN ATTIC 5) SEAL GAS PIPING PENETRATIONS INTO BLDG-NOT READY |