Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) GAS SYSTEM TO BE TESTED IN IT'S ENTIRETY. 10 PSI MINIMUM WITH NO PRESSURE LOSS FOR 15 MINUTES 2) PROVIDE BONDING ON BUILDING GAS PIPING 3) PROVIDE AGA OR CSA APPROVED GAS VALVES BEFORE UNION AT SERVICE ENTRY OR PROVIDE LEFT RIGHT NIPPLE COUPLING 4) PROVIDE AGA OF CSA APPROVED GAS VALVES AT ALL APPLIANCES 5) PROVIDE RIDGID NIPPLE THRU FURNACE APPLIANCE HOUSING 6) VENT AT FURNACE TO BE MADE UP CORRECTLY VENT IN UP WARD DIRECTION ADN HAVE 3 GALV. SCREWS AT EACH JOINT 7) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO BE RIDGID FULL SIZE GRAVITY DRAIN TO DAYLIGHT 8) REMOVE TAPE AT SINGLE TO DBL WALL VENT CONNECTION AT WATER HEATER VENT AND PROVIDE 3-GALV SCREWS AT EACH JOINT |