Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T05PL01258
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/31/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 12 PSI TEST IS OK LEFT GAS CARD ALL CORRECTIONS HAVE BEEN MADE OK TO BACKFILL TRENCH |
|
08/18/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTE #1 AND #4 |
|
08/05/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 10 PSI TEST SHALL BE IN PLACE AT TIME OF INSPECTION AND HOLD FOR 15 MINUTES WITH NO PRESSURE LOSS 2) PROVIDE PIPE PRIMER THEN TAPE ALL JOINTS AND FITTING AND TOOL MARKS ON UNDERGROUND PIPING. PRIMER IS A TYPE OF GLUE NUT PAINT 3) PROVIDE FIRM BONDING UNDER ALL IN GROUND PIPING 4) VENT FROM WATER HEATER SHALL BE APPROVED MATERIAL FROM DRAFT HOOD TO DBL WALL AT CEILING PENETRATION 5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO BE FULL SIZE RIDGID APPROVED PIPING AND GRAVITY DRAIN TO DAY LIGHT 6) VENTS FROM WATE HEATER TO BE 3' ABOVE, FURNACE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH APPROVED DBL WALL VENT PIPING AND VENT CAP |