Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/16/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTE #3 FROM 7/25/05 INSPECTION |
|
| 07/25/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BONDING OF BLDG GAS PIPING 2) PROVIDE 3-GALVANIZED SCREWS IN EACH JOINT OF VENT PIPING FROM WATER HEATER AND FURNACE VENT PIPING MAKE SURE CONNECTIONS ARE MADE UP CORRECTLY 3) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO BE FULL SIZE RIDGID PIPING, GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF SINGED BY CITY ON SITE WITH CORRECT INSTALLAION |