Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) 15 PSI TEST IS OK 2) ALL CORRECTIONS HAVE BEEN MADE 3) LEFT GAS CARD |
|
| 08/03/2005 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE A SHUT OFF VALVE AT THE UNION OUTSIDE AND REMOVE THE UNIONS INSIDE THE HOUSE. REMOVE TEES FOR FUTURE APPLIANCES. RETEST SYSTEM 2) PROVIDE A T & P RELIEF DRAIN PIPE 3) PROVIDE MINIMUM 3 SCREWS IN ALL JOINTS OF VENT CONNECTORS 4) 10 PSI PRESSURE TEST IS OK AT THIS TIME 5) OK TO BACKFILL TRENCH 6) EXTEND WATER HEATER AND FURNACE VENTS 2' ABOVE THE EVAP COOLER |