Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 10 PSI TEST SHALL BE IN PLACE ON ENTIRE GAS SYSTEM AT TIME OF REINSPECTION 2) PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES 3) WATER HEATER GAS VALVE TO BE IN REACHABLE LOCATION 4) PROVIDE BONDING OF BLDG GAS PIPING 5) PROVIDE 6" MINIMUM CLEARANCE FROM COMBUSTIBLES FOR SINGLE WALL VENT PIPING FROM WATER HEATER AND PROVIDE DBL WALL VENT PIPING THRU ROOF |