Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/28/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*SEE NOTES FROM 9/14/05 INSPECTION & COMPLY. NO TEST ON GAS SYSTEM AGAIN. |
|
| 09/14/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTE #1 FROM 9/7/05 INSPECTION, 10 PSI TEST ENTIRE SYSTEM, SHALL BE ON SYSTEM AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES 2) ALL PIPING TO BE SUPPORTED AND SECURED AT RISE TO ROOF AND ACROSS ROOF 3) PROVIDE LEFT-RIGHT NIPPLE AND COUPLING AT UNION LOCATION ON ROOF 4) PROVIDE CITY PERMITS FOR WATER HEATER AND AC/HEAT UNIT WITH INSPECTION 5) WATER HEATER REQUIRES COMBUSTION AIR AND CANNOT BE LOCATED IN A ROOM USED FOR SLEEPING 6) PROVIDE BONDING OF GAS PIPING |
|
| 09/12/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO TEST, NO ONE HOME TO PROVIDE ACCESS, I TRIED TO CONTACT #272-9394 WOULD NOT ANSWER OR TAKE A MESSAGE. PLEASE MAKE CORRECTIONS AND HAVE AN ADULT PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM |
|
| 09/09/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) NO TEST 2) NO ACCESS TO ROOF |
|
| 09/07/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) NO TEST ON SYSTEM 2) REMOVE UNION AT BLDG AND INSTALL RIGHT/LEFT NIPPLE AND COUPLING OR INSTALL APPROVED VALVES |
|
| 08/02/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTE #1 AS REQUESTED 2) SYSTEM IS BELOW 10 POUNDS 3) SHALL PROVIDE A TOTAL DEVELOPED LENGTH ON GAS PIPING WITH BTU TO CFH DEMAND PRIOR TO NEXT INSPECTION |
|
| 07/08/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS APPEARS TO BE TO SMALL IN DIAMETER UP TO THE FIRST BRANCH SUPPLY. 1" IS REQUIRED UP TO THIS POINT. CHECK BTU TO CFH DEMAND. 2) SHALL REMOVE THE UNION IN LINE ON ROOF AND REPLACE WITH A RIGHT & LEFT HAND NIPPLE. 3) RE TEST THE SYSTEM |