Permit: T05PL01110

Parcel: 14025022A


Addresses:

1401 E MILTON RD

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
11/21/2005 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
09/28/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*SEE NOTES FROM 9/14/05 INSPECTION & COMPLY. NO TEST ON GAS SYSTEM AGAIN.
09/14/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SEE NOTE #1 FROM 9/7/05 INSPECTION, 10 PSI TEST ENTIRE SYSTEM, SHALL BE ON SYSTEM AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES
2) ALL PIPING TO BE SUPPORTED AND SECURED AT RISE TO ROOF AND ACROSS ROOF
3) PROVIDE LEFT-RIGHT NIPPLE AND COUPLING AT UNION LOCATION ON ROOF
4) PROVIDE CITY PERMITS FOR WATER HEATER AND AC/HEAT UNIT WITH INSPECTION
5) WATER HEATER REQUIRES COMBUSTION AIR AND CANNOT BE LOCATED IN A ROOM USED FOR SLEEPING
6) PROVIDE BONDING OF GAS PIPING
09/12/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NO TEST, NO ONE HOME TO PROVIDE ACCESS, I TRIED TO CONTACT #272-9394 WOULD NOT ANSWER OR TAKE A MESSAGE. PLEASE MAKE CORRECTIONS AND HAVE AN ADULT PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM
09/09/2005 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1) NO TEST
2) NO ACCESS TO ROOF
09/07/2005 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1) NO TEST ON SYSTEM
2) REMOVE UNION AT BLDG AND INSTALL RIGHT/LEFT NIPPLE AND COUPLING OR INSTALL APPROVED VALVES
08/02/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SEE NOTE #1 AS REQUESTED
2) SYSTEM IS BELOW 10 POUNDS
3) SHALL PROVIDE A TOTAL DEVELOPED LENGTH ON GAS PIPING WITH BTU TO CFH DEMAND PRIOR TO NEXT INSPECTION
07/08/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999* 1) GAS APPEARS TO BE TO SMALL IN DIAMETER UP TO THE FIRST BRANCH SUPPLY. 1" IS REQUIRED UP TO THIS POINT. CHECK BTU TO CFH DEMAND. 2) SHALL REMOVE THE UNION IN LINE ON ROOF AND REPLACE WITH A RIGHT & LEFT HAND NIPPLE. 3) RE TEST THE SYSTEM