Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :* 11 PSI AIR TEST FROM METER TO WATER HEATER & WALL HEATER ONLY OK CORRECTION MADE GAS CARD AT METER. |
| 07/05/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM. 2) WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED. 3) PROVIDE APPROVED COUPLINGS ON ALL PIPING ( THREAD PROTECTORS ARE NOT ALLOWED). 4) PROVIDE CITY APPROVED PLAN WHEN USING SST TUBING IN GAS SYSTEM. 5) WATER HEATER T & P TO GRAVITY DRAIN TO DAYLIGHT WITH APPROVED PIPING MATERIAL & TERMINATE AT 90 DEGREE DOWN. 6) PROVIDE APPROVED VENT MATERIAL WITH FLASHING & APPROVED CAP FOR GAS APPLIANCES. 7) SECURE ALL PIPING CORRECTLY. 8) PROVIDE BONDING OF BUILDING GAS PIPING. 9) PROVIDE 100 SQ IN UPPER COMBUSTION AIR OPENING FOR WATER HEATER WITHIN 12" OF CEILING. |