Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/12/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 10 PSI AIR TEST NEW P.E. UNDERGROUND FROM METER UP AT BLDG OVERHEAD TO WATER HEATER AND FURNACE OK 2) TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING SHALL GRAVITY DRAIN TO DAY LIGHT. GO DOWN HILL FROM WATER HEATER TO OUTSIDE OF BLDG 3) VENT FROM WATER HEATER SHALL BE MADE UP CORRECTLY AT WATER HEATER DRAFT HOOD 4) VENT FROM FURNACE SHEALL RUN IN UPWARD ANGLE TO TERMINATION POINT ON ROOF |
|
| 07/05/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLASTIC UNDERGROUND GAS PIPING REQUIRES 18" MINIMUN COVER. 2) SUPPORT PIPING ON ROOF AT 8' INTERVALS. 3) WATER HEATER TEMPERATURE & PRESSURE RELIEF PIPING TO BE FULL SIE RIGID ( NO FLEX)) GRAVITY DRAIN TO DAYLIGHT. 4) PROVIDE BONDING OF BUILDING GAS PIPING. 5) PROVIDE 3- GALVANIZED SCREWS AT EACH JOINT OF VENT FROM WATER HEATER & FURNACE VENT PIPING, IT SHOULD BE MADE UP CORRECTLY. 6) SECURE GAS PIPE DRIP IN WATER HEATER/ FURNACE CLOSET CORRECTLY. RETEST & CALL IN FOR REINSPECTION. |