Inspection History Details
Inspection Status: Approved
Inspection History: SEPTIC - SYSTEM
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2005 | SEPTIC - SYSTEM | Approved | IVRS - Inspection :* 1) SOIL WATER TEST IS OK 2) P.O.C. OF NEW BLDG SEWER TO EXISTING SITE SEWER IS OK 3) SEPTIC TANK HAS BEEN PUMPED AND BOTTOM BROKEN 4) NOTE: SHALL PROVIDE DIRECTIONAL FITTINGS FOR BOTH TWO WAY CLEANOUTS 5) OK TO BACKFILL TRENCH UP TO THE TWO WAY CLEANOUT ONLY 6) CALL FOR FINAL INSPECTION FOR TWO WAY CLEANOUT |