Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/21/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WHERE UNIONS ARE NECESSARY LOFT RIGHT NIPPLES & COUPLINS SHALL BE USED. 2) PROVIDE BONDING OF BUILDING GAS PIPING. 3) PROVIDE WEATHER PROOF ENCLOSURE FOR WATER HEATER. 4) VENT FROM FURNACE TO HAVE 3-SCREWS AT EACH JOINT AND BE EXTENDED 2" ABOVE OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE | |
| 06/17/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUN 10 PSI AIR TEST ON GAS SYSTEM AT TIME OF INSPECTION. 2) WATER HEATER APPEARS TO BE NEW PLEASE HAVE THIS ADDED TO YOUR PERMIT AND PROVIDE CORRECT INSTALLATION.3) PLEASE HAVE SOME ONE PRESENT TO PROVIDE INFORMATION & ACCESS TO BUILDING AT TIME OF REINSPECTION |