Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* APPROVED | |
| 06/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) VENT FROM WATER HEATER TO BE INSTALLED IN DIRECTION OF FLOW ARROW, PROVIDE 1" MINIMUM CLEARANCE FROM VENT MATERIAL AND PLYWOOD OF ROOF STRUCTURE, AND PROVIDE METAL APPROVED ROOF FLASHING FOR WATER HEATER VENT 2) PROVIDE BONDING OF BLDG GAS PIPING WITH 2 BONDING CLAMPS AND #4 COPPER WIRE FROM GAS PIPING TO BLDG COLD WATER PIPING. PLEASE CALL IN 03090 AFTER COMPLETION |
|
| 06/14/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE ROOF FLASHINGS AT ALL PENETRATIONS THRU ROOF AT GAS PIPING. 2) THREAD PROTECTORS ARE NOT APPROVED COUPLINS, APPROVED COUPLNGS SHALL BE USED. 3) WHERE UN?? ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED.4) PROVIDE 10 X10" LOWER COMBUSTION AIR OPENING FOR WATER HEATER. 5) SECURE GAS PIPING DROP AT WATER HEATER. 6) SECURE ALL GAS PIPING ON ROOF. RETEST AND CALL IN. |