Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :* ALL CORRETIONS HAVE BEEN MADE. 15 PSI TEST IS OK. LEFT GAS CARD . OK TO BACKFILL TRENCH. |
| 06/01/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) EXPOSE ALL NEW PIPING. 2) PROVIDE 10 PSI TEST ON ENTIRE SYSTEM WITH TEST GAUGE WITH 1 POUND INCREMENTS. 3) WHERE UNIONS ARE NECESSARY LEFT & RIGHT NIPPLES & COUPLINGS SHALL BE USED. 4) HAVE NEW WATER HEATER ADDED TO PERMIT. 5) WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO GRAVITY DRAIN TO DAYLIGHT WITH RIDGID APPROVED PIPING MATERIAL. 6) VENT FROM WATER HEATER TO HAVE 3-GALV. SCREWS PER JOINT. 7) PROVIDE AGA OR CSA APPROVED GAS VALVE & FLEX FOR WATER HEATER. 8) PROVIDE PIPE PRIMER & ? MIL TAPE ON FITTINGS & TOOL MARKS FOR UNDERGROUND PIPING. 9) PROVIDE 10 X10 UPPER & LOWER COMBUSTION AIR INTAKE FOR WATER HEATER 12" FROM CEILING & 12" FROM FLOOR. |