Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2005 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* 1) 10 PSI TEST FROM METER NEW 3/6" SCOTCH COAT UNDERGROUND TO EXISTING BLDG SERVICE ENTRANCE TO WATER HEATERS 2) FURNACE OK 3) CORRECTIONS MADE 4) GAS CARD AT METER |
|
| 05/26/2005 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST SHALL HOLD 10 PSI FOR 15 MINUTES WITH NO DROP 2) VENT FROM WATER HEATER/FURNACE TO BE SECURED WITH 3-GALV. SCREWS PER JOINT AND 3' ABOVE TOP OF COOLER INTAKE 3) PROVIDE BONDING OF BLDG GAS PIPING |
|
| 05/22/2005 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1) ALL VALVES TO BE APPROVED TYPE 2) NO PRESSURE TEST REQUIRED 10 POUND TEST 3) BLK IRON PIPE NOT PERMITTED BELOW GRADE 4) UNION WILL REQUIRE A VALVE |
|
| 05/20/2005 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS TO GAS SYSTEM AT REINSPECTION |