Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* CITY APPROVED PLAN ON SITE, PETITION OF APPEAL 2005-185 ON SITE. CORRECTION MADE. 15 PSI AIR TEST FROM METER OVERHEAD TRANSITION TO SST TO WATER HEATER, FURNACE, COOK TOP & WALL HEATER. GAS CARD AT METER. |
| 05/17/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* 1) TEST SHALL HOLD MIN. 10 PSI WITH NO DROP FOR 15 MINUTES 2) PROVIDE CITY APPROVED GAS DRAWING ON SITE AT TIME OF INSPECTION WHEN USING SST PIPING ON GAS SYSTEM. 3) PROVIDE BONDING OF BUILDING GAS PIPING. 4) VENTS FROM WATER HEATER & FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE ( 3' WATER HEATER) ( 2' FURNACE) ABOVE TOP OF COOLER INTAKE WITH APPROVED VENT MATERIAL & APPROVED CAP. 5) VENT FROM WATER HEATER & FURNACE TO BE MADE UP CORRECTLY AND SECURED WITH 3-GALV SCREWS AT EACH JOINT. |