Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) 15 PSI TEST IS OK 2) CORRECTIONS HAVE BEEN MADE 3) LEFT GAS CARD |
|
| 05/12/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WHEN FUTURE TOES ARE INSTALLED IN LINE GAS PIPING A CITY APPROVED GAS ISOMETRIC WILL BE REQUIRED 2) SECURE AND SUPPORT PIPING ON ROOF AND AT WATER HEATER, FURNACE LOCATION 3) PROVIDE BONDING OF BLDG GAS PIPING 4) MAKE WEATHER PROOF ROOF JACKS AT PIPE PENETRATION THRU ROOF. RETEST AND CALL IN FOR REINSPECTION |