Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2005 |
PLUMBING - FINAL |
|
Approved |
|
| 05/13/2005 |
PLUMBING - FINAL |
|
Partial Approval |
IVRS - Inspection :* 1) GAS PRESSURE TEST IS OK. 2) GAS SHUT OFF VALVES OK. 3) NOTE: T & P DRAIN MAY NOT BE PIPED UP THRU ROOF ULESS A PERMIT WAS OBTAINED AND THIS APPLICATION WAS INSPECTED. IF NOT THEN AN APPEAL FROM SHALB OBTAINED AT OUR OFFICE FOR THE ALTERNATE METHOD OF T & P INSTALLATION WITH A WATER HTR DRIP PAN, AND A RELITE VALVE PEE SET @ 125 PSI LOCATED @ A EXTERIOR LOCATION AND HAVE THIS FORM ON SITE.@ TIME OF INSPECTION. |