Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/06/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*NO CHANGE FROM LAST INSPECTION. | |
| 10/05/2005 | PLUMBING - FINAL | Not ready for Inspection | BE AWARE THAT AT CONNECTION POINTS BETWEEN COPPER AND GALVANIZED PIPING CORROSION/EROSION WILL OCCUR. ALL HOSE BIBBS WHETHER OLD OR NEW WILL REQUIRE ATMOSPHERIC VACUUM BREAKERS. SEE NOTE FROM 10.03.05 IVRS - Inspection :* |
|
| 10/03/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CUT CLEAN OUT DOWN TO GRADE WITH ADAPT AND PLUG. ALL HOSE BIBS REQUIRE ATMOSPHERIC VACUUM BREAKERS GALVANIZED AND COPPER SHOULD NOT BE CONNECTED TOGETHER. |