Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2005 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* 1) THE WORK ON THIS PERMIT GOES WAY BEYOND SEWER AND WATER RELOCATE 2) PROVIDE SITE PLAN SHOWING ALL OF THE BRANCHES, AS WELL AS THE MAIN TRUNK LINE. SEVERAL BLDGS TIED INTO ONE HCS-MAY REQUIRE JOINT SEWER AGREEMENT 3) NATIVE SOILS HAVE TO MUCH CALICHI AND ROCK-SEWER TO BE SHADED WITH CLEANFILL 4) PLEASE CALL IN ALL REQUIRED INSPECTIONS 5) LOCATED SITE PLAN APPROVED BY DAVE WITT ? 6) JOINT SEWER AGREEMENT ON SITE 7) SEE NOTE #3 ABOVE 8) OK TO COVER |
|
| 08/26/2005 | PLUMBING - SEWER HCS CONNECT | Cancelled | IVRS - RI canceled |