Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 05/04/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) WHEN METER IS PINNED BY SOUTHWEST GAS ENTIRE GAS SYSTEM SHALL BE BROUGHT UP TO CURRENT CODE REQUIREMENT AND BE TESTED MINIMUM 10 PSI FOR 15 MINUTES 2) TEMPERATURE AND PRESSURE RELIEF DEVICE SHALL BE RATED TO MINIMUM BTU REQUIREMENT OF DEVICE 3) GAS FLEX TO MINIMUM BTU REQUIREMENT OF DEVICE 4) GAS REGULATOR TO BE VENTED TO OUTSIDE OF BLDG 5) PROVIDE PROOF OF 1" CLEARANCE FROM COMBUSTIBLES OF VENT FROM WATER HEATER 6) PROVIDE PROPER BONDING OF BLDG GAS PIPING |