Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 14 PSI AIR TEST NEW SCOTCH COAT FROM METER TO EXISTING AT BUILDING. OVERHEAD TO STOVE, WATER HEATER & FURNACE OK | |
| 05/11/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE BONDING OF BLDG GAS PIPING 2) PROVIDE MINIMUM 12" COVER ON UNDERGROUND STEEL GAS PIPING 3) ? AND TAPE ALL TOOL MARKS AND JOINTS ON UNDERGROUND PIPING 4) USE APPROVED COUPLING FOR CONNECTING PIECES OF PIPING. THREAD PROTECTORS ARE NOT AND WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES AND COUPLINGS SHALL BE USED 5) PIPE PENETRATIONS THRU ROOF REQUIRE APPROVED ROOF FLASHINGS 6) VENT FROM WATER HEATER AN FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' WATER HEATER, 2' FURANCE ABOVE TOP OF COLLER INTAKE. WITH APPROVED VENT MATERIAL AND CAP 7) PIPING TO BE SECURED PROPERLY ON ROOF 8) SEAL PIPE PENETRATIONS THRU WALL OF BLDGS 9) PROVIDE CSA OR AGA APPROVED VALVES AT APPLIANCES 10) VENT FROM FURNACE SINGLE WALL REQUIRES 6" CLEARANCE FROM COMBUSTIBLES 11) WATER HEATER T & P DRAIN TO GRAVITY DRAIN TO DAY LIGHT |
|
| 05/09/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |