Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) GAS PRESSURE TEST IS OK. 2) GAS SHUT OFF VALVES OK.3) WATER HTR FLU VENT T & P VALVE AND ALTERNATE METHODE OF T & P DRAIN IS OK 4) FURNACE FLU VENT IS OK 5) OK TO BACKFILL TRENCH. | |
| 04/15/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL REMOVE THE THREAD PROTECTORS IN THE GAS LINE UNDERGROUND AND REPLACE WITH APPROVED COUPLINGS 2) SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT AT FURNACE FLU VENT AND AT WATER HEATER FLU VENT AND AT APPLIANCE COLLAR 3) SHALL EXTEND T & P DRAIN TO DAY LIGHT FOR WATER HTR. THIS DRAIN SHALL BE A MINIMUM OF 3/4" WITH GRAVITY PITCH 4) YOU MAY OBTAIN AN APPEAL FORM WITH OUR OFFICE FOR THE ALTERNATE METHOD OF INSTALLATION OF T & P DRAIN. PROVIDING A WATER HEATER DRIP PAN, AND EXTEND T & P DRAIN TO PAN WITH 1' AIR GAP. CAP OFF PAN DRAIN AND LOCATE A PRESSURE RELITE VALVE PRESET AT 125 PSI ON COLD WATER SUPPLY OR A HOSE BIB 5) RETEST THE SYSTEM |