Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :* |
| 04/18/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) EVERYTHING LOCKED UP INCLUDING OFFICE NO ACCESS. |
| 04/15/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) MESSAGE LEFT, SAID SOMEONE WOULD BE HERE. 2) NO CHANGE FROM LAST INSPECTION. |
| 04/12/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*1) NEW GAS LINE INSTALLED TO SEVERAL BLDGS. EACH BLDG. TO HAVE ITS OWN SHUT OFF VALVE. 20 GAS LINE TO BE BONDED TO WATER LINE. 3) PROVIDE GAS PLAN,WITH DEVELOPED LENGTH AND TOTAL BTU CONSUPTION. 4) NO PERMIT FOR NEW HEATER AT BAPTISMAL INSTALLATION INCOMPLETE. 5) CONTRACTOR TO SHADE TRENCH WITH 6" OF CLEAN FILL AFTER REMOVING ALL ROCK AND DEBRIS FROM TRENCH. 6) ALL EXTERIOR WALL PENETRATIONS TO BE SEALED. |