Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05PL00621

Parcel: 118051000

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
04/18/2005 PLUMBING - GAS PRESSURE TEST Approved
04/14/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999* 1) GAS PRESSURE TEST SHALL HAVE A MIN OF 10LBS OF PRESSURE ON ENTRIE SYSTEM. OPEN HOUSE SHUT OFF VALVE AND BE SURE ALL OF SYSTEM HAS PRESSURE TES. 2) SHALL EXTEND T & P DRAIN FOR WATER HTR TO DAYLIGHT. YOU MAY USE COPPER,CPVC OR GALVANIZED WITH NO THREADS @ END OF PIPE JOINT @ WATER HTR FLU VENT AND @ APPLIANCE COLLAR.
04/13/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999* 1) ONCE AGAIN NO ONE HOME OR ANSWERED THE PHONE 624-6031
04/07/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999* 1) SHALL PROVIDE BLOCK SUPPORTS EVERY 6' AND STRAP DOWN PIPE WITH AT TWO HOLE STRAP ON ROOF. 2) SHALL PROVIDE ROOF FLASHINGS FOR ALL PENETRATIONS THRU ROOF. DO NOT CUT THE FLASHING TO INSTALL. 3) SHALL REMOVE THE UNION IN LINE ON ROOF AND WHERE UNIONS ARE NECESSARY USE A RIGHT AND LEFT HAND NIPPLE. IF FURNACE FLU VENT IS LOCATED WITHIN 10 FT OF COOLER THEN FLU VENT SHALL BE EXTENDED 2" ABOVE COOLER. 5) RE TEST THE SYTEM 10 LBS MIN. 6) I CALLED 624-6031 BUT NO ANSWER.