Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/28/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 3050 15 PSI AIR TEST FROM METER N? 1" P.E TO BUILDING OVERHEAD TO STOVE, FURNACE, WATER HEATER PARTIAL APPROVAL. 1) PROVIDE AGA OR CSA APPROVED GAS VALVE ON SITE FOR FURNACE. 2) VENT FROM FURNACE TO BE DOUBLE WALL THRU ROOF WITH FLASHING AND APPROVED CAP OR PROVIDE CORRECT CONNECTION INSIDE CLOSET AND PROOF OF 6" CLEARANCE FROM ALL COMBUSTIBLES WITH CORRECT FLASHING & CAP. 3) WATER HEATER VENT REQUIRES FLASHING AT ROOF. 4) PLEASE SEE SECTION 509.6 94 UPC FOR WATER HEATER LOCATION. 5) SECURE PIPING ABOVE DOOR ON EXTERIOR AND SEAL PIPE ENTRY INTO BUILDING. |