Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTION MADE GAS CARD AT METER SW GAS 889-1888 | |
| 04/18/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO CAULK FLASHINGG IS A COMBUSTIBLE MATERIAL. PROVIDE APPROVED VENT FLASHING ASSEMBLY FOR DOUBLE WALL VENT PIPING |
|
| 04/14/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* RECEIPT FOR WATER HEATER ADDTION TO PERMIT ON SITE. SEE NOTE #5 FROM 4/6/05 INSPECTION. USE CORRECT FLASHING AND NO PLASTIC ROOF CEMENT ON VENT PIPING, IT IS COMBUSTIBLE. | |
| 04/06/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) GAS VALVE AT SERVICE ENTRY LOCATION TO BE BEFOE UNION. 2) HAVE WATER HEATER ADDED TO YOUR PERMIT. 3) HAVE APPROVED GAS VALVE CSA OR AGA ON SITE FOR STOVE. 4) WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING TO BE RIDGID FULL SIZE PIPING GRAVITY DRAIN TO DAY LIGHT. 5) VENT FROM WATER HEATER TO BE DOUBLE WALL THRU ROOF WITH APPROVED VENT CAP AT TERMINATION AND ROOF FLASHING. 6) PROVIDE BONDING OF BUILDING GAS PIPING |