Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/19/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS PIPING SHALL HOLD MINIMUM 10 PSI FOR 15 MINUTES WITH NO PRESSURE LOSS 2) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING SHALL GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL FOR ALTERNATE FORM OF T & P RELIEF ON SITE WITH CORRECT INSTALLATION |
|
| 10/13/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*GAS PIPING SYSTEM TO BE TESTED TO ALL APPLIANCE SHUT OFF VALVES PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVE AT FURNACE. FURNACE VENT TO HAVE APPROVED TRANSITION FITTING FROM SINGLE TO DOUBLE WALL FLUE VENT PIPING AT CEILING WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING TO GRAVITY DRAIN TO DAYLIGHT FRUNACE TO HAVE RIDGID NIPPLE THRU APPLIANCE HOUSING PROVIDE GAS FLEX RATED FOR BTU REQUIREMENTS FOR FURNACE. PRIME & TAPE ALL TOOL MARKS ON UNDERGROUND PIPING. PRIME & TAPE REDUCER FITTING BELOW SERVICE VALVE. VENTS FROM WATER HEATER TO BE 3' ABOVE AND FURNACE 2' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING & APPROVED VENT CAP. PROVIDE 3-GALV SCREWS AT EACH JOINT OF FLUE VENT PIPING |