Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2005 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) ALL CORRECTIONS HAVE BEEN MADE PLEASE CALL WHEN PRESSURE RELIEF VALVE PER SET @ 125 PSI HAS BEEN INSTALLED | |
| 03/16/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 9:15AM AN ADULT SHALL BE PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM AT REINSPECTION TIME. |
|
| 03/14/2005 | PLUMBING - FINAL | Denied | 1) SHALL OBTAIN A APPEAL FROM WITH OUR OFFICE FOR THE ALTERNATE METHOD OF T & P DRAIN INSTALLATION PRIOR TO NEXT INSPECTION. 2) OK TO BACKFILL TRENCH. |