Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 03/04/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* 30 PSI AIR TEST NEW 1" SCOTCH COAT FROM METER UNDERGROUND OVERHEAD TO WATER HEATER & FURNACE AND TO STOVE OK |
| 03/03/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection :* 1) GAS PIPING TO BE ROUTED TO PROVIDE WATER HEATER REPLACEMENT SPACE. 2) WATER HEATER TEMPERATURE & PRESSURE RELIEF PIPING TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE SIGNE? BY CITY PETITION OF APPEAL FOR ALTERANATE FORM OF TEMP & PRESSURE RELIEF ON SITE WITH INSTALLATION. 3) PROVIDE BONDING OF BUILDING GAS PIPING FROM METER TO BUILDING 30 PSI AIR TEST OK. 4) SEE NOTE #1 AND RETEST |